Gnd Fl 142 Central Street

Refurbishment Project | Floor Power Track System + Suspended LED lighting

Ground 142 Central St We have been awarded the contract for another refurbishment phase at 142 Central St on the Ground Floor The specification includes new floor power track system and a suspended direct/indirect Plexiform LED lighting system exposed ceiling mounted cable tray 3750 sq Ft

The project is a 5 week fitout striped back to base.
The project is for an existing long term client.