Advance 365

Case: Advance 365

Project type: Electrical contracting and data network installation

The project:
A new office fit-out

The challenge:
To maintain a flexible approach to a fluid and organic project.

Work done:

  • Designed and installed a lighting scheme with occupancy sensors and fittings selected to offer energy savings.
  • Installed the planned 150-point data network which increased to 210 points over the duration of the project.
  • Installed a fibre optic data link.
  • Installed floor power track and floor outlet boxes into a suspended computer floor.