Refurbishment Project | Floor Power Track System + Suspended LED lighting
1st 142 Central St We are currently part of the team refurbishing the 1st floorThe specification includes new floor power track system and a suspended direct/indirect LED lighting system exposed ceiling mounted cable tray 3750 sq Ft
The project is a 7 week fitout striped back to base.
The project is for an existing long term client.